The Victorian Electrical Distribution Networks (VEDN) is a committee formed to manage accreditation of contractors who are involved in the civil aspects of underground electrical infrastructure on behalf of a third party developer, and are not engaged by a VESI Network Operator.

Examples of these work includes:

    • Excavations
    • Trenching
    • Installation of conduits/ducts
    • Boring
    • Cable hauling
    • Installation of earthing systems

The information on this webpage is provided for:

    • Identifying accredited contractors within VEDN;
    • Gaining VEDN accreditation from VESI Network Operators, and
    • Providing VEDN consistent standards and VEDN downloads.

In applying for VEDN accreditation, the Contractor agrees to accept the Conditions of Victorian Electricity Distribution Network Approval.

Contractors with VEDN accreditation shall still obtain individual project approval from the host network operator or their agent prior to accessing their network, or commencement of projects that will form part of the distribution network. Accreditation does not override the individual requirements to tender for the installation of underground electrical civil work contracts.

The VESI Network Operators do not cover any accreditation costs incurred through the accreditation process, the applicant will meet all costs associated with gaining accreditation.

 VEDN – Purpose

The objective of the VEDN is to:

    • Develop, review and maintain an Accreditation and accompanying Quality Assurance System suitable for civil infrastructure contractors working in the Victorian Electricity Supply Industry (VESI).
    • Provide a forum to standardise and unify requirements across the five Victorian Distribution Businesses, and
    • Monitor the performance of contractors and act to maintain the integrity of the accreditation and registration process.
Network OperatorRepresentativeContact details
AusNetRod BerryVEDN@ausnetservices.com.au
AusNetLucas JureyVEDN@ausnetservices.com.au
CitiPower / PowercorPeter Gillhamvedn@powercor.com.au

CitiPower / PowercorDamien Oudinvedn@powercor.com.au

JemenaJohn Vasilopoulosvedn@jemena.com.au

United EnergyAdam Beelvedn@ue.com.au

VEDN Accredited Roles

Accredited roles within the Victorian Electrical Distribution Network (VEDN) are listed below, along with details of a summary of requirements to become accredited to undertake civil underground electrical infrastructure works.

To meet the VEDN requirements as a civil contractor to perform the installation of underground electrical civil works, evidence is required to be submitted including:

  • Work Health, Safety, Environment and Quality management system
  • Evidence of employees training currency
  • Inspection and Test Procedures
  • Worksite and system audits

Worksite Auditor (Civil) -Approved only to carry out open trench audits (civil) i.e. the initial pit pipe/conduit and trench inspections – for Developer / Customer managed projects on Greenfield sites.

Worksite Auditors (Electrical) –Approved only to carry out open trench audits (civil) and electrical inspections – for Developer/Customer managed projects. (Not pre commissioning / final inspections)

Network Worksite Auditors (All stages) – Network Auditor employed / contracted to carry out all inspections on all projects including the pre-commissioning/final audits on behalf of the Network Owner

Cable Hauling Auditors (All stages) – Electrical Auditor engaged to carry out inspections of the cable hauling process

Network Business Auditor (Electrical) –Approved only to carry out open trench audits (civil) and electrical inspections – for Network Owner managed projects. (Not pre-commissioning and final inspections)

Network Business Auditor (Civil) –Approved only to carry out open trench audits (civil) i.e. the initial pit pipe/conduit and trench inspections – for Network Owner managed projects

Note: Auditors without a current Network Owner Electrical Access Authorisations must comply with WorkSafe/ESV No Go Zone Regulations.

Doc IconVEDN Module 1 course outlineDownload
Doc IconVEDN Module 4 course outlineDownload

Registered Training Organisations can make application for the VEDN training packages (Module 1,4 and Module 5,6) by completing a Data Supply Agreement. Please contact a member of the VEDN Committee to discuss further.

Are companies that are JAS-ANZ accredited who audit integrated management systems.

PDF IconWork undertaken by non-accredited civil contractors Download

Civil contractors that are not VEDN accreditedfor the installation of underground electrical civil work arerequired to implement a more rigorous auditing process. Please contact a member of the VEDN Committee to discuss further.

 

Work Health, Safety, Environment and Quality (WHSEQ)Management System Requirements

The Contractor must have an integrated Work Health, Safety,Environment & Quality Management System that meets the requirements of:

    • AS 4801:2001 (Safety)
    • ISI 14001:2015 (Environment)
    • ISO 9001:2015 (Quality), and
    • Contains the required VEDN Network special requirements.
      • Pre-qualified approval work type
      • Access to Network Owners technical standards
      • VEDN training
      • Project approval to proceed
      • VEDN audit requirements
      • Legal obligations
      • Plant and equipment

 

The Contractor must be able to demonstrate application of their WHSEQ systems and that it includes the following elements:

  • Induction, Training & Competency
  • Hazard identification & Risk Assessment Procedure
  • Incident Reporting & Investigation
  • Corrective Actions Process
  • Hazardous Substances & Dangerous Goods
  • Use of PPE for civil works when working under Green Book
  • Consultation & Communication
  • Environmental Aspects and Impacts
  • Plant & Equipment Safety
  • An internal audit programme
  • Test and Inspection Records
  • Safety Performance Monitoring
  • Calibration, IMTE and PETE Management
  • Safe Work Practices and Procedures

Victorian Electricity Distribution Network Operators will maintain a register of contractors that meet the VEDN underground electrical infrastructure civil works requirements.

Only contractors that hold current VEDN accreditation shall perform VEDN related works and holding VEDN accreditation does not guarantee work.

The awarding of work to VEDN accredited contractors will be in accordance with the Network Operator or third party clients’ selection and engagement processes.

  • Application for Accreditation

Applicants must provide sufficient supporting documentation to demonstrate compliance with the specified eligibility criteria for the approval type sought.

The applicant will be required to provide as evidence, details of a recent audit of their WHSEQ Management System and its deployment in the field, conducted by a VEDN Recognised Systems Auditor. The applicant applying for accreditation, or upgrading of their current accreditation status, must allow at least six weeks for review of their application after they have submitted the required information.

  • Related and Subsidiary Companies

The company in control of the work must hold the relevant VEDN accreditation in its own right which does not extend to their subcontractors, subsidiary or other engaged personnel. However subcontractors are permitted provided they are working directly under the Accredited Contractors WHSEQ Management System and contract requirements (i.e. SWMS, supervision, work practices and auditing process) and a trained person is directly supervising the work at all times.

  • Assessment and Notification

The VEDN Review Panel will assess applications against the specified eligibility criteria. Applicant/s may be required to supply additional information to clarify details of their application.

By submitting an application for accreditation, the applicant/s are deemed to authorise the VEDN Review Panel to seek verification of the information supplied.

Applicant/s will be notified in writing of their accreditation status and details will be provided in the case of non-acceptance.

Unless circumstances warrant an earlier review, accreditation status will remain valid for a period of twelve (12) months from the date of approval, or the date of any review that confirms the status.

  • Updating of Register Details

Contractors shall notify the VEDN Review Panel of any significant change to their technical capacity, address, ownership or holding as soon as practicable.

  • Performance Assessment

Identified poor performance of accredited contractors will trigger a requirement to participate in regular reviews of their performance against the eligibility criteria and approval type. The VEDN Review Panel will consider and implement changes if appropriate.

  • Review of Accreditation Status

The VEDN Review Panel reserves the right to review any contractor’s accreditation at any time. The contractor may also request a review be conducted by the VEDN Review Panel.

Upon request, the contractor must provide any information required for the review. Failure to comply with any request may result in suspension, or re-classification of a contractors accreditation.

Before such action is taken, the Contractor will be given an opportunity to show cause as to why the approval should not be suspended, or reclassified.

The Contractor will also be given details of the matter prompting the request to show cause. These matters may include:

  • Failure to provide a letter from a VEDN Recognised Systems Auditor confirming the ongoing suitability of WHSEQ management system and its deployment in the field annually.
  • A period of more than twelve (12) months has elapsed since the review that confirmed the status of the contractor;
  • A period of more than twelve (12) months has elapsed since the review following unsatisfactory performance;
  • A period of more than twelve (12) months has elapsed since the review of changes to technical capacity was carried out;
  • A period of more than twelve (12) months has elapsed since the review that confirmed the status of the contractor, which commenced following breaches of VEDN preliminary or full approval conditions.

Where accreditation is suspended, the Contractor will be entitled to make application for reinstatement within a nominated period. Such applications will require the contractor to demonstrate that any matters that lead to suspension have been rectified. If accreditation is not reinstated within the nominated suspension period, the contractor’s accreditation will be rescinded and removed from the VEDN register.

  • Determination

A determination by the VEDN Review Panel of any application for accreditation or for reclassification, suspension, or rescission, is at the VEDN Review Panels absolute discretion. The Review Panel will not be liable for any costs or damages incurred in the exercise of such discretion.

  • Confidentiality and Publicity

The VEDN will publish the names, addresses and categories of accredited contractors for notification of accreditation purposes. No responsibility is accepted for any consequences arising from the publication of such information.

In applying for accreditation, the applicant agrees to the publishing of their company details and VEDN accreditation status. Other information provided with applications will not be disclosed to any other party except where necessary for the assessment of the application.

  • Compliance and Contract Requirements

Interim Pre-Qualification, Pre-Qualification and Accreditation does not negate the need for a contractor to fully comply with contract conditions. All Contractors must comply fully with all relevant Acts, Legislation, Codes of Practice and the Network Operators requirements for the works being undertaken.

  • Acceptance of Conditions

By applying for approval contractors agree to accept the Victorian Electricity Distribution Network Operators Conditions of Approval.

 

 Find someone VEDN approved

The below downloads contain a listing of all VEDN Approved – Contractors, Auditors and RTOs.

PDF IconAll Civil ContractorsDownload
PDF IconAll Worksite AuditorsDownload
PDF IconAll System AuditorsDownload
PDF IconAll Registered Training OrganisationsDownload

 

Become VEDN Approved

  1. Identify your host Distribution Business by entering your full business address in the ‘Electricity Distributor Map’ section at this link.
  2. Download and fill out the applicable VEDN role Application Form found below.
  3. Submit the form and all required evidence by email to your host Distribution Business.

Note – any submitted evidence that is not requested in the Application Form will be deleted.

Note – the maximum email size is typically 15MB, evidence may need to be sent via more than one email.

 
VEDN Underground Electrical Infrastructure Civil Works Accreditation Form
PDF IconVEDN Underground Electrical Infrastructure Civil Works Accreditation formDownload
 
VEDN Underground Electrical Infrastructure Auditor Accreditation Form
PDF IconVEDN Underground Electrical Infrastructure Auditor Application formDownload
 
VEDN Underground Electrical Cable Hauling Auditor Accreditation Form
PDF IconVEDN Underground Electrical Cable Hauling Auditor Application formDownload

 

Urban Residential Development (URD) Design and Construction Standard

PDF IconVESI URD Standard 2022Download

The purpose of this standard is to provide a common set of engineering design and construction principles for Urban Residential Development (URD) installation across all Victorian electricity supply industries (VESI) that meet the relevant legislative and Australian Standards requirements.

This common approach ensures installations are of a high standard of safety, quality, reliability and operational performance, ultimately to the benefit of the Victorian community.

While every effort has been made to have a common standard for the majority of URD installation requirement, some requirements are Distribution Business (DB) specific and therefore reference may be required to a DB specific standard. Where this is required it will be outlined within this standard.

For any other design and construction standards related to URD estates not included in this document please refer to the individual DB for their requirements.

This standard has been developed jointly by CitiPower/Powercor, United Energy, Jemena Electricity Networks and AusNet.

Note: For URD estates within the CitiPower network, high density, industrial and commercial developments in all DBs, please refer to the individual DB for their requirements.

 

Construction Industry Interface Guideline

PDF IconConstruction Industry Interface GuidelineDownload

The Construction Industry Interface Guideline clarifies the responsibilities and arrangements in regard to safety and protocols at the interface between the construction industry and electrical supply industry on construction and demolition sites.

The Guideline was produced by representatives from all of the Victorian Electricity Distribution Companies and from the Victorian Construction Safety Alliance (organisation representing member construction companies).

The document covers the principles and arrangements to be employed where construction industry and electricity network operators interface on major demolition and construction sites. This includes safe work on/around and access/egress to construction/demolition sites and substation enclosures.

VEDN Downloads

PDF IconVEDN Bulletin July 2026 – Streamlined Accreditation ProcessDownload
PDF IconVEDN Bulletin 24 (Sept-2025)Download
PDF IconVEDN Bulletin 23 (Dec-2024)Download
PDF IconVEDN Bulletin 22 (May-2022)Download
PDF IconVEDN Bulletin 16 (Jan-2022)Download
PDF IconVEDN Bulletin 15 (Sept-2017)Download
PDF IconVEDN-Bulletin-13 (Dec 2016)Download
PDF IconVEDN Bulletin 12 (Jun-2016)Download
PDF IconVEDN Bulletin 11 (May-2016)Download
PDF IconVEDN Bulletin 10 (Jan-2016)Download
PDF IconVEDN Bulletin 9 (Oct-2015)Download
PDF IconVEDN Bulletin 8 (Aug-2015)Download
PDF IconVEDN Bulletin 7 (Apr-2015)Download
PDF IconVEDN Bulletin 6 (Oct-2014)Download
PDF IconVEDN Bulletin 5 (May-2014)Download
PDF IconVEDN Bulletin 3 (June-2013)Download
PDF IconVEDN Bulletin 2 (June-2012)Download
PDF IconVEDN Bulletin 1 (April-2012)Download
PDF IconWhip ChecksDownload